精品一区二区免费在线观看-欧美激情另类-欧美韩日高清-先锋资源国产-3d国产无线网站aaa的破局在线观看-国产精品十八禁在线-精品亚洲va在线va天堂资源站-欧美黑人粗暴多交高潮水最多-午夜主播福利-亚洲视频在线免费看-久久亚洲热

TPI PL 2X18MW Cement Kiln Waste Heat Power Plant, Thailand

Release time:2009-06-06 Article source: Reading times: 【A+ A A-】

TPI PL Company (Thailand) has three cement kilns with a production of 8000t per day. The waste heat power plant is composed of 6 forehead kiln and kiln outlet boilers which are transported into two 18MW double pass-out turbo-generators through Hyper thermal Steam Header, and the hyper thermal fume-gas is connected to the water transport kiln. The project is very difficult, characterized by long steam pipe and sophisticated function system. CNEEC was responsible for design, equipment and principal materials supply, site guide services, and overall performance guarantee. No.1 unit was synchronized on 21 Feb., 2009 and No. 2 unit on 15 March, 2009. The performance testing was completed on 25 April, 2009, fitting to or even superior to the designed capacity. The ower signed the completion certificate in the same day.

Quick link

Contact us

ADD : CNEEC BLDG., 9, SOUTH SHOUTI RD., HAIDIAN DISTRICT, BEIJING 100048 P.R.CHINA

TEL : (8610)68798899

FAX : (8610)68798000

E-MAIL : cneec@cneec.com.cn

Legal Notice| Site Map

Beijing ICP No. 17028836    Copyright?China National Electric Engineering Co., Ltd. , All Rights Reserved