精品一区二区免费在线观看-欧美激情另类-欧美韩日高清-先锋资源国产-3d国产无线网站aaa的破局在线观看-国产精品十八禁在线-精品亚洲va在线va天堂资源站-欧美黑人粗暴多交高潮水最多-午夜主播福利-亚洲视频在线免费看-久久亚洲热

News Center

Successful Completion of 72-hour Full-load Trial Operation for the 3rd High-temperature and Ultra-high-pressure Waste Incineration Boiler of Thailand TPIPP 150MW RDF Power Plant Project

Release time:2026-05-28 Article source: Reading times: 【A+ A A-】


Recently, the Thailand TPIPP 150MW RDF Power Plant Project, undertaken by CNEEC as the general contractor, has achieved a major milestone. The 3rd high-temperature and ultra-high-pressure waste incineration boiler has smoothly completed its 72-hour full-load trial operation, with all performance indicators meeting the contractual requirements. This marks the full completion of all construction works for the project.

Going forward, the project team will steadily carry out handover and finalization work, and fully guarantee the long-term safe and stable operation of the power plant. Leveraging excellent project deliverables and professional capabilities, the company will further enhance its brand influence in the Thai market, drive follow-up project development and local construction, and continuously fuel ecological environmental protection and energy structure optimization across Southeast Asia.


Quick link

Contact us

ADD : CNEEC BLDG., 9, SOUTH SHOUTI RD., HAIDIAN DISTRICT, BEIJING 100048 P.R.CHINA

TEL : (8610)68798899

FAX : (8610)68798000

E-MAIL : cneec@cneec.com.cn

Legal Notice| Site Map

Beijing ICP No. 17028836    Copyright?China National Electric Engineering Co., Ltd. , All Rights Reserved